Top Questions Â黨ÐÇ¿Õmv Aviation Construction Answered by Industry Experts
/in Blog /by SwinertonAs one of America’s most trusted airport construction companies, Â黨ÐÇ¿Õmvbrings over 60 years of aviation construction expertise to airports nationwide. Our comprehensive airport construction services have transformed more than 50 commercial airports while maintaining seamless operations. Whether you’re planning a terminal renovation, infrastructure upgrade, or new facility construction, Â黨ÐÇ¿Õmvaviation delivers exceptional results.
From operational continuity to sustainability: Swinerton's aviation specialists address the most pressing challenges in airport development.
Airport construction is unlike any other type of project because it must occur within fully operational facilities. The complexity lies in maintaining day-to-day airport functions while upgrading or building new infrastructure.
Â黨ÐÇ¿Õmvhas recently demonstrated this expertise providing comprehensive construction management and project coordination to successfully execute work at some of the busiest airports in the world.
- At Denver International Airport (DEN) we completed the United Airlines’ Gates of the Future (GOTF) project without a single flight delay or cancellation.
- At Los Angeles International Airport (LAX), Â黨ÐÇ¿Õmvis optimizing the baggage system in the International Terminal while maintaining current operations without disruption.
- At Hartsfield-Jackson Atlanta International Airport, Â黨ÐÇ¿Õmvhas built-out roughly 50,000 sf of Sky Club and In-Flight Service Lounge spaces elevating the airline’s passenger experience without disrupting operations.
Key Differences:
- 24/7 Operations: Construction often occurs during strict overnight windows to avoid disrupting daily airport operations. For example, at DEN, crews worked from 10 p.m. to 4:30 a.m., ensuring gates were ready to receive passengers by 5 a.m.
- Security Requirements: Teams must maintain stringent security protocols, including nightly security sweeps to ensure no tools or materials remain in passenger areas.
- Tight Coordination: Projects require collaboration with multiple stakeholders, including airlines, airport authorities, and federal agencies like the TSA.
- Existing Facilities & Infrastructure: Airport projects typically require coordination with or modification to existing facilities and utilities but are often provided with incomplete as-built documentation. Careful planning, investigation, and due diligence are key to smooth construction execution.
- Ìý´¡³Ù Long Beach Airport (LGB), new construction was set adjacent to the operational terminal facility and required extensive investigation of existing buildings and systems. As part of this scope, Â黨ÐÇ¿Õmvhired a subcontractor to perform underground utility mapping to discover unforeseen conditions prior to construction.
Â黨ÐÇ¿Õmvemploys a phased construction approach to ensure airport operations remain unaffected. This method involves dividing the project into manageable segments and completing them systematically to avoid major interruptions.
Our Approach:
- Clear wayfinding and temporary signage guide passengers through construction zones.
- Real-Time Coordination: Regular stakeholder meetings allow for proactive problem-solving and schedule optimization.
- At LAX, Â黨ÐÇ¿Õmvregularly co-locates with our project teams; designers, engineers, subcontractors, airport project managers; to enable real-time coordination and collaboration.
- Phased Implementation: Work is divided into manageable segments with detailed logistics plans.
- At DEN, Â黨ÐÇ¿Õmvcoordinated the renovation of United Airlines’ gates into holdroom groups, carefully coordinating the transformation of up to eight gates simultaneously.
As passenger expectations evolve and technology advances, several key trends are transforming airport construction:
Key Trends:
Touchless Technologies
- Facial recognition at security checkpoints
- Self-service check-in and baggage systems
- Touchless restroom facilities
- Digital wayfinding solutions
Enhanced Passenger Experience
- Intuitive wayfinding
- Varied seating options with integrated power
- Sound-dampening features for comfort
- Improved ADA accessibility
- Integration of natural elements and biophilic design
Data-Driven Design
- Pedestrian simulation modeling to optimize flow and maximize revenue
- Dynamic queuing systems
- Space utilization analysis
- Real-time capacity management
- Smart parking solutions
Check out this from Carrie Shaeffer, VP, Division Manager about the latest airport construction trends.
Swinerton’s success in aviation construction stems from our deep understanding of airport operations, commitment to excellence, and proven ability to deliver complex projects without disrupting operations.
Our Differentiators:
- Extensive Experience Reduces your Risk: Over 60 years of aviation construction expertise across more than 50 commercial airports.
- Proven Process: Our ONE TEAM approach ensures seamless collaboration between all stakeholders.
- Outstanding Results: Serving as a long-term partner to airports and airlines across the country, Â黨ÐÇ¿Õmvcontinuously demonstrates our ability to deliver ahead of schedule and under budget while maintaining perfect safety records and zero operational impacts.
- Â黨ÐÇ¿Õmvstrives to build strong relationships serving as a reliable construction partner with our clients and has executed roughly 100 projects with Delta Air Lines and Southwest Airlines at airports across their services areas.
Sustainability is integral to modern aviation construction, aligning with airports’ environmental goals while delivering long-term value.
Sustainable Practices:
- Material Selection: We prioritize sustainable materials, including low-VOC paints and carpeting, low embodied carbon structural solutions, recyclable surfaces, and durable furnishings that reduce replacement frequency.
- Waste Management: Construction waste is carefully sorted for recycling and reuse.
- At DEN, we achieved 100% recycling of existing carpet and repurposed much of the existing seating and technology.
- Energy Efficiency: Projects integrate energy-efficient systems and technologies to reduce long-term environmental impact.
Â黨ÐÇ¿Õmvleverages advanced technologies and innovative approaches to enhance project delivery and ensure exceptional results.
Key Capabilities:
- Virtual Design and Construction: We utilize BIM modeling and advanced coordination tools to optimize installations and prevent conflicts before construction begins.
- Quality Tracking Technology: Our custom PowerBI-based Quality Tracker system enables real-time monitoring of construction quality and progress.
- Communication Platforms: Digital tools facilitate seamless coordination between stakeholders and enable quick response to changing conditions.
Aviation construction requires a unique combination of precision, collaboration, and innovation. At Swinerton, we’re proud to bring decades of expertise to every project, ensuring airports remain operational while delivering world-class infrastructure.
Have More Questions?
Contact our team of experts to learn more about how Â黨ÐÇ¿Õmvcan elevate your airport construction projects.